Hotline
0799-6796868
Product advantages
1. Acid and alkali resistance, corrosion resistance, aging resistance, long service life.
2. The flexible socket connection with high performance rubber sealing ring has good sealing performance, which can effectively prevent sweat leakage and protect underground water source.
3. The inspection well and the pipeline move together and settle evenly, which solves the problem of uneven settlement caused by the connection of traditional brick well and plastic pipe.
4. The inner wall is smooth and smooth, the dirt is not easy to be detained, the possibility of blockage is reduced, and the drainage performance is greatly enhanced.
5. It is light in weight, easy to operate, and can be constructed in all weather conditions. It is safe, convenient and low in comprehensive cost.
Product specifications:(Units mm)
shaft | 200 | 315 | 350 | 400 | 450 | 500 | 630 | 700 |
branch | 110B | 160B | 200A | 225A | 225A | 225A | 300A | 300A |
160B | 200A | 225A | 300A | 300A | 300A | 400A | 400A | |
225A | 300A | 400A | 400A | 500A | 500A | |||
300A | 600A |
Plastic inspection well superiority comparison
Comparative advantage | Geocomposite Drain | Traditional bricklaying Wells |
Technology | Polymer resin as raw material, factory precast production, injection molding once, stable and controllable quality. | The site manually built, the quality is uncontrollable, can not be recycled, pollution of the environment. |
environmental protection | Water and material saving and energy saving can be recycled with long service life. | Waste resources, waste fertile land and pollute the environment. |
leakproofness | With elastic sealing ring flexible socket connection, good sealing. | With cement wrapped, rigid connection, easy to occur uneven settlement, easy to permeate. |
robustness | Not suitable for collapse construction safety service life of at least 50 years. | The average service life is 3-5 years. |
drainage capacity | The inner wall of well base is smooth, the friction coefficient is small, and the drainage capacity is high. | Channel guide is not clear, cement plaster is rough, poor drainage capacity. |
fficiency of construction | Plastic inspection Wells assembled from finished products, not affected by climate, fast construction. | Artificial bricklaying, affected by climatic conditions during construction period. |
Embedded Cost | Labor :2 people, time: half a day, direct material cost: low | Take 10 inspection Wells as an example, manual number :2 people, time-consuming number :10 days, direct material cost: high |